5. Assembling

BASE-RAY

®

BASE-RAY is shipped assembled in lengths up to six (6)

lineal feet – longer assemblies are shipped in two or more
sub-assemblies for assembly on the job (see BASE-RAY
Assembly chart, page 4). One man can join tow sub-
assemblies together in a matter of minutes providing he
has a BASE-RAY Assembly Clamp (available at a nominal
charge) and follows the recommended procedure.

In assembling BASE-RAY sub-assemblies on the job,

the sections should be lined up, face down, on the À oor

or

other

À at surface near the wall on which they are to

be installed. Ends of section, nipple ports and nipples

should be thoroughly cleaned with kerosene or gasoline

and wiped dry with a clean cloth.

Place a thin coating of nipple lubricant on nipples and

insert into the nipple ports of one assembly without

cocking. Engage nipples in nipple ports of second

assembly and push sections together by hand as far as

possible keeping ends of sections parallel.

In order to secure necessary leverage with BASE-RAY

Clamp, cut two pieces of 1¼” steel pipe 15” long and

place them on the two cam handles.

Insert BASE-RAY Clamp nose in the recesses in the

BASE-RAY

castings,

being certain that the nose of

the clamp is resting on the bottom of the recess

THIS IS IMPORTANT. If the clamp nose will not

reach the bottom of the recess, exert light pressure

downward on the cam handles until the two castings are

PARTIALLY drawn together. Release the pressure on

the handles and the clamp nose will then drop to the

bottom of the recess.

Press down on both cam handles simultaneously until

castings are drawn together. Be sure clamp is not tilted,
since this may break casting.
If nipples do not draw up
evenly during ¿ nal tightening, strike end of assembly with
wood block and hammer or mallet to bring the sections
back in line. Do not strike BASE-RAY sections with
metal hammer.

Remove the clamp, place the tie bolts in the bolt slots and

tighten securely.

6. Installation of BASE-RAY

®

Assemblies

Install

all

¿ ttings in end of sections and all necessary

vents while assemblies are still laying À at on À oor.

Install bottom center supports prior to raising assemblies to

upright position. Refer to table for number of supports
required. They should be spaced evenly.

y

l

b

m

e

s

s

A

h

t

g

n

e

L

m

o

t

t

o

B

d

n

a

p

o

T

f

o

r

e

b

m

u

N

d

e

r

i

u

q

e

R

s

t

r

o

p

p

u

S

r

e

t

n

e

C

t

e

e

F

l

a

e

n

i

L

½

4

1

o

t

½

1

1

t

e

e

F

l

a

e

n

i

L

½

1

2

o

t

5

1

2

t

e

e

F

l

a

e

n

i

L

½

8

2

o

t

2

2

3

Install the spring clip Bottom Center support by pushing it all the
way up against the bottom of two ¿ ns and next to the waterway
of the section as illustrated below. Run the ¼” cap screw into
the clip until head is not more than ¾” from the clip.