beautypg.com

Section 6, Powering up the monitoring system – Bacharach HGM300 User Manual

Page 13

background image

SECTION 6

Powering Up the Monitoring System

(Warm up time is 15 minutes)

Start up checkpoints:

• All buttons on RDM800 “chirp” when pressed. (Contact the factory if they do not “chirp”)

DO NOT

plug any unused zones. During start up the software will pull a vacuum test to verify the

number of zones and a plugged zone will give a false count

• Communication connection between HGM300 and RDM800

• Check node address for the HGM300 (or multiple HGM300”s)

• Terminator

positions


13