Installation, Fitting the upper support frame, Note – Neff I89DK62N0B User Manual
Page 13: Fitting the lower support frame, Notes
13
Installation
Fitting the upper support frame
1.
Before fitting, determine the total height of the support frame
and mark the screw holes.
Note: The height of the support frame can be adjusted in 20
mm intervals.
2.
On the ceiling, mark the centre point of the appliance.
3.
Using the enclosed template, mark the positions for the
screws on the ceiling.
4.
Drill four 8 mm diameter holes to a depth of 80 mm for the
fasteners and press in the wall plugs flush with the ceiling.
5.
Fasten the upper part of the support frame to the ceiling with
4 screws.
Note: Ensure that the support frame is in the correct position.
The middle bracket defines the preferred side and must be
facing the hob control elements.
Fitting the lower support frame
Fasten the upper and lower part of the support frame at the
specified total height using 10 screws.
Notes
■
Ensure that the lower support frame is in the correct position.
The open side must be facing the hob control elements.
■
The support frame can be subsequently re-positioned by
loosening the securing screws.
[
[
[
[
([KDXVW
PP
&LUFXODWHGDLU
PP