beautypg.com

Installation instructions, Installing the cooker hood 17, Wall drilling and bracket fixing – AEG X66453BV0 User Manual

Page 17

background image

INSTALLING THE COOKER HOOD

17

INSTALLATION INSTRUCTIONS

Wall drilling and bracket fixing

As a first step, proceed with the following drawings:

• a vertical line up to the ceiling or up to the upper limit,

at the centre of the area in which the hood is to be

fitted;

• a horizontal line at a minimum 1004 mm above the

cooker top.

• Mark a point (

1) on the horizontal line, 247 mm to the

right of the vertical reference line.

• Repeat this operation on the other side, checking that

the two marks are levelled.

• Mark a reference point (

2) as indicated at 210 mm

from the vertical reference line and 482 mm above the

cooker top.

• Repeat this operation on the other side, checking that

the two marks are levelled.

• Drill at the marked points (

1), using a ø 12 mm drill bit.

• Drill at the marked points (

2) using a ø 8 mm drill bit.

• Insert the bracket plugs

11a into the holes (1) and

tighten the screws.

• Insert plug

11 into holes (2).

To install a decorative chimney ( optional )

• Place bracket

7.2.1 on the wall, about 1-2 mm from

the ceiling or from the upper limit, aligning the centre

(notch) with the vertical reference line.

• Mark the wall at the centres of the bracket holes.

• Place the bracket

7.2.1 on the wall at X mm below the

first bracket (X = height of the upper chimney section),

aligning the centre (notch) with the vertical line.

• Mark the wall at the centres of the bracket holes.

• Drill ø 8 mm holes at all the marked centre points.

• Insert the wall plugs

11 in the holes.

• Fix the brackets using the

12a screws (4,2 x 44,4) sup-

plied with the hood.

���

���

��

���

��� ���

����

���

���

���

���

�����