Installation – AEG X69453MD02 User Manual
Page 13
EN - INSTALLATION
13
INSTALLATION
Wall drilling and bracket fixing
As a first step, proceed with the following drawings:
• a vertical line up to the ceiling or up to the upper limit, at the centre of the area in which the
hood is to be fitted;
• a horizontal line at a minimum 1004 mm above the cooker top.
• Mark a point (
1) on the horizontal line, 247 mm to the right of the vertical reference line.
• Repeat this operation on the other side, checking that the two marks are levelled.
• Mark a reference point (
2) as indicated at 210 mm from the vertical reference line and 482
mm above the cooker top.
• Repeat this operation on the other side, checking that the two marks are levelled.
• Drill at the marked points (
1), using a ø 12 mm drill bit.
• Drill at the marked points (
2) using a ø 8 mm drill bit.
• Insert the bracket plugs
11a into the holes (1) and tighten the screws.
• Insert plug
11 into holes (2).
To install a decorative chimney ( optional )
• Place bracket
7.2.1 on the wall, about 1-2 mm from the ceiling or from the upper limit,
aligning the centre (notch) with the vertical reference line.
• Mark the wall at the centres of the bracket holes.
• Place the bracket
7.2.1 on the wall at X mm below the first bracket (X = height of the upper
chimney section), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the bracket holes.
• Drill ø 8 mm holes at all the marked centre points.
• Insert the wall plugs
11 in the holes.
• Fix the brackets using the
12a screws (4,2 x 44,4) supplied with the hood.
11a
1
1
2
2
210
11
12a
247 247
1004
482
400
210
X
1ч2
7.2.1