beautypg.com

American Dryer Corp. Super AD-30 User Manual

Page 61

background image

57

SECTION X

PROCEDURE FOR FUNCTIONAL CHECK OF

REPLACEMENT COMPONENTS

1. Microprocessor (computer) Board

a. Upon completing installation of the replacement microprocessor (computer) board, reestablish power to

the dryer.

b. Start the drying cycle.

c. Verify that the motor(s) and the heat indicator dots, in the microprocessor (computer) L.E.D. display are

on. (Refer to the illustration below.)

d. Verify that motor(s) heat, and door indicator lights on the back side of the microprocessor (computer

board are lit. (Refer to illustration below.)