American Telecom SL PTG012 User Manual
Page 3

AMERI*CAN TELECOM INC.
Technical Document
 
 
 
 
SL PTG012 Installation Instructions 
Page 3
3. Attach each PTQ365 charger to the housing using two (2) nylon spacers (p/n
180100-00) under the charger, and two (2) #6-19 screws (p/n 180012-00) per 
charger. 
 
 
 
 
 
 
 
 
 
 PTQ365 
 
 
 
4. Plug a power supply jack into each charger. 
5. Plug in the AC power cord to turn power on. Verify that each charger LED is lit 
solid red.
6. Place a SPECTRALINK battery into each charger position.
Verify that each charger LED is lit solid green. 
 
 
Battery 
 
 
 
 
 
 
 
 
 LED 
 
 
 
Enclosure Installation 
 
The SL PTG012 SpectraLink Phone and Charging station can be placed on a table or can 
be wall mounted. When wall mounted, the enclosure can be mounted horizontally or 
vertically, using a Philips screwdriver and the included mounting hardware. To mount the 
SL PTG012 Station to the wall, install the enclosure as follows: 
 
1. Locate the four screws and anchors supplied with the kit.