American Telecom SL PTG012 User Manual
Page 2

AMERI*CAN TELECOM INC.
Technical Document
 
 
 
 
SL PTG012 Installation Instructions 
Page 2
Charger Installation 
 
The SL PTG012 SpectraLink Phone and Charging station is shipped with its power 
supply and charger regulator boards installed, and with their distribution jacks routed and 
configured, as illustrated here: 
 
SL PTG012, Rear View
 
 
At the front of the unit: 
 
1. Lift open the front door of the enclosure. 
2. Locate the pre-drilled hole-pairs, and identify the pairs that will be used to mount 
the individual battery chargers (refer to the photo at the top of this page). 
 
 
 
 
 
 
 Door 
 
 
 
 
 
Charger 
Power 
Supply 
Jacks 
 
 
 Charger Mounting Hole-pairs 
