Brockston bath vanity, Installing quartz countertop and lavatory, Setting up your new vanity – Decolav 1790 User Manual
Page 2: Assembly instructions
Please contact 1-866-332-6528 for further assistance
DecolaV.com
© Deco laV, inc. 2014
2
assemBly instructions
• Place the quartz countertop and lavatory on top of the vanity cabinet.
adjustments may be necessary to align correctly. see figure 1
installing quartz countertoP and
lavatory
2
• carefully remove your new vanity from carton and place safely aside
• turn off water supply to faucet
• remove existing vanity
• Determine the location in the bathroom the vanity will be installed
• measure the vanity width and height and mark outline on wall
• move the vanity into place and level with the adjustable glides on bottom
of vanity
• locate and mark wall studs
setting uP your new vanity
1
Brockston Bath vanity
item #1790-roK
figure 1
figure 2
Apply Silicone Here
Apply Silicone Here
Vanity
Quartz
Countertop
Lavatory
36.1
916
8.5
216
15.7
400
3
76
6
152
0.5
12
28.7
729
FRONT VIEW
30"
762
23.8
605
16
406
3.7
93
1.7
42
1.8
45
22
560
TOP VIEW
33.7
856
2.4
60
23.1
586
SIDE VIEW
Finished Wall
Finished Floor
Finished Wall
note: use Decolav drain item #9290-cP/sn/Pn/DB,
9296-cP/sn/Pn/DB or #9298-cP/sn/Pn/DB.
Decolav cannot guarntee leakage wih other manufacturer drains.
note: use Decolav decorative bottle trap item #9102-cP/sn/
Pn/DB to complete the look.