beautypg.com

Cycle stall elite – American Bicycle Security Company Cycle Stall Elite User Manual

Page 3

background image

American Bicycle Security Company

P.O. Box 7359

Ventura, CA 93006

Ph: (800) 245-3723 or (805) 933-3688

Fax: (805) 933-1865

www.ameribike.com

Email:

[email protected]

Cycle Stall Elite

*Tools Needed for Installation

Tape Measure

Marker or Pencil

Masonry Drill Bit 3/8”

Drill (Hammer drill recommended)

Hammer

Wrench 9/16”

Installation

Installation Steps:

Recommended Base Materials:

A concrete base is the best surface for installation.
For installation into asphalt, separate asphalt
anchors and instructions will be sent with the rack.

Installation:

Attach the Cycle Stall segments on street with the

supplied 3/8” x 2.75” carriage bolts, and move

assembled unit into place. 3/8” anchors are shipped with

the rack. Be sure nothing is underneath the base material

that could be damaged by drilling. Place the rack in the

desired location. Use a marker or pencil to outline the

holes of the flange onto the base material. Drill the holes

in accordance with the specifications shipped with the

anchors. Make sure the holes are at least 6” away from

any cracks in the base material. Tap in anchors and

follow your specific anchor instructions provided with the

rack.


Tamper Resistant Fasteners:

The concrete spike is a permanent anchor. The
top of the wedge anchor can also be pounded
sideways after installation so that it cannot be
removed. Other tamper resistant fasteners are
also available for purchase. When using the
special tamper resistant nuts, always set and
first tighten the anchors. Once the rack is
installed, replace two nuts from the bracket
(opposite sides from each other) with the
tamper resistant fastener. DO NOT

OVERTIGHTEN the tamper resistant nut.

2.

1.

2.

3.