If using fasteners, install fasteners as each panel is put into place and
before the next division bar or molding strip is applied. Begin fastening
at top edge and work towards the opposite end. Apply silicone sealant
prior to inserting rivets or fasteners. Install fasteners one row at a
time.
Install on-piece division bar and caps or next molding piece by laying
down a bead of silicone in molding groove and sliding completely onto
the panel. Withdraw the molding or division bar 1/8” to provide proper
spacing. The free edge of the molding or division bar may be tacked in
place, if preferred, before installing the next panel.
If using Titebond® Advanced Polymer Panel Adhesive and fasteners
are not used, a few nails may be placed at the top (above the ceiling
grid line) to help hold panels in place while the adhesive cures. Once
cured, the nails must be removed, as they do not allow for normal
panel expansion and contraction.
Repeat the process, working in one direction around the room.
STEP 3 – COMPLETING PANEL INSTALLATION
Be sure to apply silicone sealant in all molding and around all panel
edges, fasteners, and fixtures to prevent moisture from penetrating
behind panels.
Remove any residue left by adhesive as recommended by
manufacturer.
Clean panels thoroughly prior to leaving jobsite.