beautypg.com

J. preoperational instructions opl models – American Dryer Corp. Phase 7 OPL with S.A.F.E. Gas DSI AD-78 IV User Manual

Page 36

background image

32

8. Check to insure that ALL setscrews (i.e., basket [tumbler] drive, idler, etc.) are tight.

J. PREOPERATIONAL INSTRUCTIONS

OPL MODELS

1. To start the dryer:

a. Microprocessor Controller (Computer) Dryers...

1) Light emitting diode (L.E.D.) display will read “REAdY” (meaning no cycle in progress).

2) Press the letter on the keyboard (touch pad) corresponding to the cycle desired (i.e., key “E”)...

a) The dryer will then start (rotate).

3) L.E.D. display will now show “Cycle In Progress” and “Cycle Status” meaning that the dryer is in

the drying cycle (dry mode for 30 minutes) and count downwards in minutes.

NOTE: Pressing keyboard (touch pad) key “A,” “B,” “C,” “D,” or “F” will also start the dryer. The

six (6) preprogrammed drying cycles “A” through “F” have been stored in the microprocessor
controller (computer) memory. Refer to the Programming Manual supplied with the dryer for
more specific operating instructions.

NOTE: The dryer can be stopped at any time by opening the main door or by pressing the “STOP”

red key. To restart the dryer, press the “START”

green key or a preprogrammed cycle

key (i.e., “E”).

NOTE: Selection (settings) changes can be made at any time during the drying cycle by pressing the

“STOP”

red key twice. The L.E.D. display will return to “REAdY” at which time a new

cycle selection can be made.

b. Dual Timer Dryers...

1) Turn drying timer knob for a time of 20 minutes.

2) Select “High Temp.”

3) Push “Push To Start” switch.

4) To stop dryer, open the main door.

a) Spin and dwell (stop) times are adjustable at

the reversing timer.