Installation – A.J. Antunes & Co MT-12 9200148 User Manual
Page 5

5
P/N 1010918 Rev. E 03/13
INSTALLATION
1. Remove unit and all packing materials
from shipping carton.
2. Open the large box. It should contain
the following items:
• Muffin Toaster with Crumb Tray
• Information Packet
3. Remove information packet.
4. Remove all packing materials and pro-
tective coverings from the unit.
NOTE: If any parts are missing or dam-
aged, contact Antunes IMMEDIATELY at
1-630-784-1000 or in the U.S. or Canada,
1-800-253-2991 toll free.
5. Clean the toaster with a damp cloth.
Remove and clean the Crumb Tray
and Removable Plate (refer to the
Maintenance secton of this manual).
When placing the toaster into service, pay
attention to the following guidelines.
• Make sure the unit’s power On/Off
switch is off and the toaster is at
room temperature before plugging in
the power cord.
• Do not block or cover any openings
on the unit.
• Do not immerse the power cord or
plug in water.
• Keep the power cord away from
heated surfaces.
• Do not allow the power cord to hang
over edge of table or counter.
Plug the power cord into the appropriate
power outlet. Refer to the specification
plate for the proper voltage.
Figure 1. Muffin Toaster MT-12
Partial
Load
READY
Crumb
Tray
Front Door
Control Knob
Indicator Light
(Amber)
Indicator Light (Green)
Removable
Plate
Partial Load Timer Control Knob