1. Locate mixing valve in a suitable place
accessible for servicing and adjusting. Valve
should be as close as possible to point of use.
2. Thoroughly flush supplies.
3. Connect Hot and Cold supplies to mixing valve
inlets and outlet to fixture. Supply lines by
others.
4. Turn on supplies and inspect for leaks. Tighten
connections if leak(s) are detected.
5. Turn on fixture and allow to run until water
temperature stabilizes. Measure water
temperature. If water is not at desired
temperature adjust as needed, (refer to
adjustment section below). Maximum
recommended outlet temperature is 95°F
(35°C).
1. Loosen locknut. Detail A
2. Turn on fixture so temperature can stabilize.
3. Using allen wrench turn adjustment stem
counter-clockwise for hotter or clockwise for
colder outlet temperature. Detail B
4. Tighten locknut to prevent any unauthorized
or accidental temperature adjustment.
5. Re-check temperature.
6. In circumstances where chemical reaction is
accelerated by flushing fluid temperature, a
medical advisor should be consulted for the
optimum temperature for each application.
INSTALLER
PROVIDED
SUPPLIES
INSTALLER
PROVIDED
RISER
TYPICAL INSTALLATION
INSTALLATION:
TEMPERATURE ADJUSTMENT:
Acorn Controls
Division of Acorn Engineering Company
®
, A member of Morris Group International
™
DETAIL B
DETAIL A
LOCKNUT
WRENCH
ALLEN
WRENCH
ADJUSTMENT
STEM
Manual #7802-113-000
Date: 04/01/14
ET71 Installation & Operation Manual