beautypg.com

Step 9. final installation checklist – Samsung NX583G0VBSR-AA User Manual

Page 36

background image

36_ installation instructions

Step 9. Final installation checklist

You have just completed installing your range. Make sure all controls are in the off

position and the flow of ventilation air to the range is unobstructed. The following

is a checklist to confirm your range is safely installed and ready for operation.

- Gas line has been properly connected to the range.

The gas has been turned on. All connections have been

checked for leaks.

- Range is plugged into the properly grounded electrical

receptacle.

- Approved anti-tip bracket is properly installed and engaged with the range.

- Range is leveled and is firmly sitting on a solid,

level floor.

- Gas surface burners have been properly

assembled.

- All burners have been tested for proper

operation.

- FOR INSTALLER ONLY—Check and/or adjust

the broil and oven burner flames as described on

page 37 in this manual.

Gas Range

Plug

Locking screw

(Install)FX710BGS_FX510BGS_DG68-00357A-02_EN_121106.indd 36

2012-11-19 �� 5:43:42

This manual is related to the following products: