Clary DT Series ET User Manual
Page 10

T H E C O N T I N U O U S P O W E R C O M P A N Y
Page 10
INSTALLATION
odels can be installed in a 19" rack system. 
Units are supplied with add-on brackets for 
these applications. The system is 
lightweight and can be easily moved. Some 
important points to consider when positioning a unit 
for operation: 
 The installation site should maintain an ambient air 
temperature of less than 165
o
F (74
o
C). When the
environment for the system remains cooler during 
operation, there is less stress on the batteries and 
the internal electronics. 
The air inlets, vents and fan should not be
obstructed or blocked in any way. The more 
breathing space the system has, the cooler it 
operates. 
The air should remain free from excessive dust
and chemical fumes.
The front panel is designed to fit in a standard 19"
rack. This panel fills a 31/2-inch slot. This system 
weighs in excess of 25 pounds, front panel 
mounting was not intended to support the entire 
unit. Rear support brackets are recommended. 
Contact the factory if assistance is required in 
properly mounting into a rack. 
Once a location has been selected and the unit is 
installed, it is ready for operation. 
Allow at least 8 hours, after the system is first 
installed, to fully charge the internal battery to a 
maximum state. 
M
!
