beautypg.com

Mechanical venting, Single unit installation, Vent installation – State SBD100 399NE A User Manual

Page 23: Multiple unit installations

background image

23

MECHANICAL VENTING

SINGLE UNIT INSTALLATION

When mechanical venting of these heaters is desired, the
following kits are available.

SBD 120 through the SBD 200/A
State part number 193933

SBD 250/A through the SBD 500/A
State part number 193933-1

Where an approved power venter is to be installed to operate in
conjunction with the water heater thermostat, the following codes
must be adhered to. Field wiring should conform to the latest
version of the National Electric Code ANSI/NFPA No. 70. For
Canadian installations the electrical connections and grounding
shall be done in accordance with the current Canadian Electrical
Code CSA C22.1 Part 1 and/or local codes.

NOTE: The power venter must be installed downstream of the
drafthood. See figure 13.

FIGURE 13

VENT INSTALLATION

Seal all joints between the power venter and the vent termination.
This is to prevent leakage of exhaust products into the room(s)
due to positive pressure of blower.

The "Sequence of Operation" description will be the same with
mechanical venting except,

When the appliance thermostat calls for heat:

Thermostat contacts "Close" and the power venter blower
(120 VAC) is energized. Sufficient draft must be established for
the "Draft Prover Switch (N.O.)" to "Close". When the draft prover
switch "Closes" the relay coil of the flue damper is energized.

See side wall vent kit installation manual for complete
instructions.

MULTIPLE UNIT INSTALLATIONS

For multiple unit installations, contact State Water Heaters
Technical Support Center at 1-800-527-1953.

TABLE 5

MANIFOLD GAS PRESSURE IN INCHES

OF WATER COLUMN (ALL MODELS*)

TYPE OF GAS

NATURAL

PROPANE

3.5

10.0

Gas pressure specified in Table 5, refer to flow pressure taken
at pressure tap of automatic gas valve while heater is operating.

TABLE 6

APPROXIMATE TIME REQUIRED TO CONSUME

1 CU. FT. OF GAS AT FULL CAPACITY

TIME REQ’D

INPUT

TYPE

BTUH

TO CONSUME

RATE

OF

PER

1 CU. FT.

(BTUH)

GAS

CU. FT.

OF GAS

120,000

NATURAL

1050

31.5 SEC.

PROPANE

2500

75.0 SEC.

154,000

NATURAL

1050

24.5 SEC.

PROPANE

2500

58.4 SEC.

180,000

NATURAL

1050

21.1 SEC.

PROPANE

2500

50.3 SEC.

190,000

NATURAL

1050

19.9 SEC.

PROPANE

2500

47.4 SEC.

199,000

NATURAL

1050

19.0 SEC.

PROPANE

2500

47.4 SEC.

250,000

NATURAL

1050

15.1 SEC.

PROPANE

2500

35.3 SEC.

251,000

NATURAL

1050

15.06 SEC.

PROPANE

2500

35.1 SEC.

275,000

NATURAL

1050

13.75 SEC.

PROPANE

2500

32.2 SEC.

305,000

NATURAL

1050

12.4 SEC.

PROPANE

2500

29.5 SEC.

360,000

NATURAL

1050

11.4 SEC.

PROPANE

2500

24.0 SEC.

365,000

NATURAL

1050

10.4 SEC.

PROPANE

2500

24.7 SEC.

399,000

NATURAL

1050

9.5 SEC.

PROPANE

2500

22.6 SEC.

500,000

NATURAL

1050

7.6 SEC.

PROPANE

2500

18.0 SEC.

Figures shown are valid for 0-2000 ft.(0-610m) installations.
See “HIGH ALTITUDE INSTALLATIONS” for deration
requirements over 2000 ft.(610m).

TABLE 7

PILOT BURNER INFORMATION

PILOT BURNER

RATED

TYPE OF

PART NUMBER

ORIFICE

MODEL

GAS

(WITH ORIFICE)

SIZE

ALL

NATURAL

193314-0

0.018

MODELS

PROPANE

193314-1

0.014

This manual is related to the following products: