beautypg.com

Assembly instructions, Machine operation – Yetter 2961-010-015 Cut and Move Coulter/Residue Manager Opener User Manual

Page 9

background image

9

ASSEMBLY INSTRUCTIONS

2961 – CUT AND MOVE

STEP 10.

Install the residue manager wheel/stem assembly onto the 2961-200 coulter bracket weldment

and insert the 6100-321 adjustment pin through the parts and secure with 1/8” hairpin cotter.

OPERATION PRECAUTIONS

STOP!!!

Read this before using the Yetter product.

- MACHINE OPERATION

IMPORTANT: failure to properly set the planter frame height and levelness can
result in less than successful operation of the planter and the Yetter product and
may result in damaged equipment. All operators should read and thoroughly
understand the instructions given prior to using the Yetter product.

NOTE: DO NOT use this product if the planter is not adjusted properly!

Leveling the planter:
With the planter lowered to proper operating height (Usually 20”-22”). Read the
planter operator’s manual for recommended setting
. Check to be sure the toolbar
and row unit parallel arms are level fore and aft. Re-check when the planter is in the
field and has been fully loaded with seed, fertilizer, granular chemicals, etc. Also, a
field check with a bubble level on the frame should be made of the hitch height to ensure
level operation front to back.

It is important for the planter to operate level laterally. Tire pressure must be maintained
at pressures specified by the manufacturer.

Field and actual planting conditions change and will dictate planter frame heights. You
must ensure that the row unit parallel arms are approximately parallel with the ground.
IMPORTANT: For proper operation of the planter attachments and row units, it is
imperative that the planter toolbars and row unit parallel arms be level side-to-side and
front-to-rear. The toolbar frame should operate at a 20”-22” height from the planting
surface
. Check the manufacturer’s operator’s manual for instructions on how to adjust
the frame height and levelness.