beautypg.com

American Dryer Corp. Wet Wash ML-79 User Manual

Page 46

background image

42

SECTION IX

PROCEDURE FOR FUNCTIONAL CHECK OF

REPLACEMENT COMPONENTS

1. Microprocessor (computer) Board

a.

Upon completing installation of the replacement microprocessor (computer) board, reestablish power to
the dryer.

b. Start the drying cycle.

c.

Verify that the motors and the heat indicator dots, in the microprocessor (computer) L.E.D. display are
on. (Refer to the illustration below).

d. Verify that the motors heat, and door indicator lights on the back side of the microprocessor (computer)

board are lit.