ADC AD-410 User Manual
Page 48
![background image](/manuals/40224/48/background.png)
4 4
11. Reverse the procedure for reinstalling the gas valve/manifold assembly to the dryer.
12. Open ALL gas shut-off valves (closed in Step #2).
13. Reestablish electrical service to the dryer.
a. Test ALL connections for leaks.
IMPORTANT:
T
est ALL connections for leaks by brushing on a soapy water solution (liquid
detergent works well).
WARNING: NEVER TEST FOR LEAKS WITH A FLAME!!!
14. Operate the dryer through one (1) complete drying cycle to insure proper operation.