11. Connect a ½” x 38” hose from the front port of each cylinder to the remaining pipe
line on the rear cross frame.
12. Raise the rear of the frame and install wheels to hubs. Also install wheels to front axle
assembly.
13. Raise front of frame and remove the two 5/8” x 4” bolts which hold the cast socket
halves inside the gooseneck. Remove the cast socket halves.
14. Roll the pole and axle assembly directly under the gooseneck, place the cast socket
halves around the ball socket on the axle. Lower the frame into place so that the socket
halves seat into the gooseneck. (If necessary, clamp halves together with C-clamp while
inserting into gooseneck.) Replace 5/8” x 4” bolts and tighten securely. Install long shank
grease fitting into the hole in the back side of gooseneck.
15. Install all the grease fittings and grease liberally.
16. If available, place assembled scraper on level floor or pavement and measure the
distance from the cutting edge to floor, on both left and right sides, and then adjust axle
spindle to obtain equal distance on both sides.