Installation instructions, Step 10 connect water supply (freezer models only), Step 11 start icemaker – GE ZIRP360NXLH User Manual
Page 20: Step 12 install toekick
Installation Instructions
20
STEP 10 CONNECT WATER SUPPLY
(FREEZER MODELS ONLY)
/RFDWHDQGEULQJWKHWXELQJWRWKHIURQWRIWKHFDELQHW
7XUQWKHZDWHURQWRIOXVKGHEULVIURPWKHOLQH5XQ
about a quart of water through the tubing into a
bucket, then shut off the water.
Copper Tubing:
6OLSDµQXWDQGIHUUXOHSURYLGHGRYHUERWKHQGV
of the copper tubing. Insert the tube into the union
fitting on the unit and tighten the nut to the union.
7XUQRQWKHZDWHUWRFKHFNIRUOHDNV
GE SmartConnect
™
Tubing:
,QVHUWWKHPROGHGHQGRIWKHWXELQJLQWRWKH
UHIULJHUDWRURUIUHH]HUFRQQHFWLRQ7LJKWHQWKH
compression nut until it is just hand-tight.
7LJKWHQRQHDGGLWLRQDOWXUQZLWKDZUHQFK
2YHUWLJKWHQLQJFDQFDXVHOHDNV
7XUQRQWKHZDWHUWRFKHFNIRUOHDNV
NOTE: Make sure excess tubing length does not
interfere with the toekick installation.
Freezer
Water Supply
House
Water Supply
STEP 11 START ICEMAKER
6OLGHWKHVZLWFKWR217KHLFHPDNHUZLOOEHJLQ
operation automatically.
%HVXUHQRWKLQJLQWHUIHUHVZLWKWKHVZHHSRIWKHIHHOHU
arm.
'LVFDUGWKHILUVWIXOOEXFNHWRILFHFXEHV
7RWXUQWKHLFHPDNHURIIVOLGHWKHVZLWFKWR2))
Icemaker
Feeler Arm
Power
Switch
STEP 12 INSTALL TOEKICK
/RFDWHWKHVXSSOLHGWRHNLFNVKLSSHGWDSHGWR
the side of the refrigerator). Install the toekick
assembly with the 3 screws provided, adjust to the
desired height and tighten the screws.
$FXVWRPWRHNLFNFDQEHLQVWDOOHGWRPDWFKRU
FRPSOHPHQWWKHVXUURXQGLQJFDELQHWU\8VHWKH
supplied toekick as a template to cut the shape.
IMPORTANT:7KHJDSEHWZHHQWKHERWWRPRIWKH
refrigerator cabinet and the top of the toekick must
remain unobstructed for proper air circulation.