beautypg.com

Installation instructions, Prepare the air conditioner (continues), Prepare the case – GE AEM25DP User Manual

Page 10

background image

installation instructions

10

installation instructions

PREPARE THE AiR CONDiTiONER

(continues)

Remove the shipping screws located on

the top of the case.

Remove the ground screws from each

side of the case. Keep it in a safe location.

NOTE: Be sure to save this screw. You will need

them later in the installation.

Slide the air conditioner from the case by

gripping the base pan handle and pulling

forward while bracing the case. Do not

pull or lift on the styrofoam discharge area.

Your unit may come with internal

packaging. This packaging must be

removed prior to installing the air

conditioner back into the cabinet.

3

E

F

FRONT

Do not

pull

or lift

in this

area—

damage

to the

unit may

result

PREPARE THE CASE

Attach the top rail gasket to the bottom

of the top rail.

Install the top mounting rail with 4 type A

screws from the inside of the case. Press

firmly to drive the screws into the gasket

and through the top mounting rail.

Slide each side retainer onto the edge of

each according panel. The figure shows

the orientation of each accordion panel

and side retainer assembly relative to the

case from a top view of the unit.

Slide the left and right accordion panels

into the top and bottom mounting rails.

A

Top mounting rail

B

4

G

H

C

D

WINDOW FILLER PANEL

WINDOW FILLER PANEL

SIDE RETAINER

SIDE RETAINER

Top left

Top right

Bottom mounting rail

FRONT