Installation preparation, Prepare the opening – GE PSB9100DFBB User Manual
Page 6

6
Installation Preparation
PREPARE THE OPENING
(CONT.)
Installation over a GE Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
µ
µ
µ
µ
µ
µ
Min.
µ0LQ
,QVWDOO[RU
[5XQQHUV
or Solid
Bottom. Must
Support 100
lbs.
Construct
Solid Bottom
0LQµ
Plywood
Supported
E\[RU
[5XQQHUV
all Four Sides
PREPARE THE OPENING
The Advantium 120 can be installed in combination
with other GE appliances. Always follow each
product’s Installation Instructions to complete
the installation.
Single Advantium 120 Installation:
2UGHUDµZLGHVLQJOHRYHQFDELQHWRUFXWWKH
opening in a wall to the dimensions shown.
$OZD\VPDLQWDLQµPLQLPXPKHLJKWIURP
the floor to the cutout in any single or combined
installation.
$OORZµFDVHWULPRYHUODSDWWKHWRSDQG
µRYHUODSRQWKHERWWRPDQGHDFKVLGHRIWKH
opening.
2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV
of the opening.
When installed over a single oven or a warming
GUDZHUDOORZDWOHDVWµEHWZHHQWKHWZRRSHQLQJV
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other
appliance overlaps.
&RQVWUXFWDVROLGRYHQIORRURIµPLQWKLFN
SO\ZRRGVXSSRUWHGE\[UXQQHUVRQDOOVLGHV
7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG
flush with the bottom edge of the cutout.
27µ
µ
µ
µ
Construct
Base
0LQµ
Plywood
Supported
E\[
RU[
Runners all
Four Sides
µ
Min.