Installing a half-length expansion board, Installing a full-length expansion board – HP ProLiant DL380p Gen8 Server User Manual
Page 73

Hardware options installation 73
Installing a half-length expansion board
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
4.
Remove the access panel (on page
5.
Remove the PCI riser cage (on page
6.
Remove the expansion slot blank ("
Removing the expansion slot blanks
" on page
7.
Install the expansion board.
8.
Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
9.
Install the PCI riser cage (on page
10.
Install the access panel (on page
11.
Install the server into the rack ("
Installing the server into the rack
" on page
12.
Connect each power cord to the server.
13.
Connect each power cord to the power source.
14.
Installing a full-length expansion board
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
4.