beautypg.com

American Dryer Corp. AD-230 User Manual

Page 27

background image

23

The size of the main gas supply line (header) will vary depending on the distance this line travels from

the gas meter (or in the case of L.P. [liquid propane] gas, the supply tank), the number of tees, other gas-

operated appliances on the supply line, etc. Specific information regarding supply line size should be

determined by the gas supplier.

NOTE: Undersized gas supply piping can create a low or inconsistent pressure which will result

in erratic operation of the burner ignition system.

Consistent gas pressure is essential at ALL gas connections. It is recommended that a 3/4" pipe loop be

installed in the supply line serving the bank of dryers. An in-line pressure regulator must be installed in

the gas supply line (header) if (natural) gas line pressure exceeds 12.0 inches water column pressure.

(Refer to the illustration below for details.)

IMPORTANT: Water column pressure of 3.5 inches for natural gas dryers and 10.5 inches for

L.P. gas is required at the gas valve pressure tap of each dryer for proper and
safe operation.

A 1/8" N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply

line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural gas and L.P. gas must be

used.