beautypg.com

Prior to initial start-up – AEG SANTO 3150-7 KG User Manual

Page 19

background image

818 17 59-00/5

19

Prior to Initial Start-Up

1

Before connecting the appliance to the mains and putting it into ope-
ration for the first time, leave the appliance to stand for 30 minutes if
was transported upright. After transport on its side, the appliance must
be left to stand for 4 hours before putting it into operation. This is
necessary to allow the oil to flow back into the compressor. Otherwise
the compressor may be damaged.

0

1. Please clean the appliance interior and all accessories prior to initial

start-up (see section: "Maintenance and Cleaning").

2. Remove the cold accumulation block from the freezer tray.

3. Place the cold accumulation block into a compartment or drawer only

after the optimal storage temperature of -18 °C has been reached, and
allow to freeze.

4. After 24 hours place the cold accumulation block at the front of the

upper drawer.

5. Re-freeze the thawed cold accumulation block in the same fashion, e.g.

after cleaning the appliance.