beautypg.com

American Dryer Corp. EURO-12 User Manual

Page 53

background image

49

OPL MODELS (PHASE 7)

1. Microprocessor Controller (Computer) Board

a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish

power to the dryer.

b. Start the drying cycle.

c. Verify that the motor(s) and the heat indicator dots, in the microprocessor controller (computer) light

emitting diode (L.E.D.) display are on. (Refer to the illustration below.)