beautypg.com

5 making tank piping connections, Important – Sterlco S Series Central Chilling Stations User Manual

Page 23

background image

SCW Series Central Chilling Stations

Page 23 of 77


From Process

The chilled water return for water returning back to the chiller
from the process to be cooled and recirculated. Adjust the
butterfly valve for the pressure drop that corresponds to the model
number of the chiller. Pressure drop is equal to supply pressure
minus return pressure

Model

Water Side Pressure Drop

Condenser (each)

Evaporator (each)

Number

Flow (gpm)

PD (psi)

Flow (gpm)

PD (psi)

SCWW/R60 91

4.0 72

5.3

SCWW/R75 102

4.7

90

4.5

SCWW/R90 117

4.4

107

5.6

SCWW/R100 150

5.5

123

3.9

SCWWR115 166

4.3

140

3.0

SCWW/R145 196

4.1

175

4.8

SCWW/R165 219

4.1

200

4.6

SCWW/R195 278

4.7

232

6.0

3-5 Making Tank Piping Connections

If you have purchased the SCW Series central chilling station with
the integral pump tank, please proceed with this section.


Return

Bring the chilled water returning from the process to the pump
tank warm

From Process

side. This line is sized according to the

flow rate from the process to the pump tank. See Section 3-3 on
Page 21 for more information on piping considerations.

Important!

Do not use the SCW Series unit to support piping.

Makeup

Connect a city water source to maintain water level in the pump
tank.


Overflow

Connect the

OVERFLOW

outlet to an approved, trapped drain to

permit excess water in the pump tank to overflow to the drain. The
overflow line is sized according to the size of the pump tank.

To Drain

Connect to a 1½” line (approx. 63 mm) leading to an approved,
trapped drain. You can drain the pump tank if necessary.