beautypg.com

Dis con tin ued, Pt33 features installation – Seametrics PT33 User Manual

Page 2

background image

Input Indicator

Separate Output test
and Accumulator
reset buttons

Accumulator #2
setting switches

Accumulator #1
setting switches

Timer #2 setting
switches

Timer #1 setting
switches

Power switch
and indicator

Cover screws
and box mounting
screw holes

Three pin SeaMetrics
connector standard-
strain relief optional
(order matching
connector with meter)

Power input cord
(6’ length)

Timer #1
output cord
(7" length)

Timer #2
output cord
(7" length)

Internal 10 Amp
replaceable fuse

OFF

ON

TEST

TEST

INPUT

TIMER 1

TIMER 2

PT33

DUAL

ACCUMULATOR

TIMER

OFF

ON

OFF

ON

Output time

(in seconds)

equals the sum

of the switches

turned "ON".

Output time
(in seconds)
equals the sum
of the switches
turned "ON".

This switch "ON"
multiplies by 10

T

I

M

E
R

1

64

32

16

8

4

2

1

This switch "ON"
multiplies by 10

32

64

16

8

4

2

1

Setting equals

the sum of

the switches
turned "ON".

This switch "ON"
multiplies by 10

A
C
C
U

M

1

32

64

16

8

4

2

1

Setting equals
the sum of
the switches
turned "ON".

This switch "ON"
multiplies by 10

A
C
C
U

M

2

T

I

M

E
R

2

Separate Output
Indicators

Mounting. Use a secure surface which will accept
screws. To gain access to the mounting screw holes,
remove the front clear cover. Mounting screw holes are
at the four corners, under the cover screws. Using the
box or enclosed template, mark centers of these holes
with a pencil and drill. Finally, insert the enclosed screws
through the four corner holes and tighten.

Terminal Access. It is not normally necessary to ac-
cess terminals, since all connections can be made ex-
ternally. However, conduit connection requires the front
plate to be removed to reach the terminals. See Con-
nections diagram.

Connect the Meter. Standard units use a meter con-
nector. The mating half of this three-pin “SeaMetrics”
connector can be ordered preinstalled on the end of the
meter cable, or can be ordered as a separate item. See
diagram for pin numbers. Plug in the connector and
secure the threaded locking ring.

Connect Power. A power cord is provided standard.
Connect by plugging in to any grounded outlet. See
Connections diagram for conduit connection.

Connect the Load. On standard units, a short pigtail
cord with receptacle is provided for connection of a 115
VAC load. The unit can also be hard-wired if necessary.
See Connections diagram.

Pin Numbers for Connector - Field Installation

2

3

1

INPUT CONNECTOR

1 POWER GND
2 INPUT SIGNAL
3 POWER OUTPUT +12VDC

TO CONNECTOR PIN 1

TO CONNECTOR PIN 1

TO CONNECTOR PIN 2

TO CONNECTOR PIN 2

TO CONNECTOR PIN 3

BLACK

WHITE

RED

ME, IP, WT FLOW METER

MR METER (or other dry contact)

2 of 4

PT33 Features

Installation

DIS

CON

TIN

UED

This manual is related to the following products: