NSi Industries DGUM100A User Manual
Page 7

5
5.0 HOLIDAY DATES
You are able to select up to 9 holiday blocks, which
will exclude all of the regular schedules, and execute a
special set that will only run on those specified days . If
no holiday schedule is entered in step 6, operations
will be omitted during the block . Holiday blocks can be
anywhere from 1 day in length (the same start and end
dates) or up to 364 days . Holiday blocks cannot
end after they begin . If a holiday block must run from
December 18th through January 5th, you have to
program one block from 12/18 to 12/31, and then
another from 01/01 to 01/05 .
To skip, press the MODE key .
5.1 TO SET HOLIDAY DATES
Press the ENTER key .
Press the MONTH, and DATE keys to set the date to
the desired start date (H1 ON) .
Press the ENTER key .