beautypg.com

Installation, Installation 3.1 installation – KROHNE VA 40 ATEX II2G Ex i EN User Manual

Page 10

background image

3

INSTALLATION

10

VA40

www.krohne.com

06/2013 - 4002262402 - MA VA40-Ex-II2G-AD R02 en

Installation

3.1 Installation

Installation and setup must be carried out according to the applicable installation installation
standards (e.g. EN 60079-14) by qualified personnel trained in explosion protection. The
information given in the Installation and Operation Instructions and the Supplementary
Installation and Operation Instructions must always be observed.

Variable area flowmeters must be installed in such a way that

• There is no danger from mechanical impact effects.
• There are no external forces affecting the indicator part.
• The device is accessible for any visual inspections that are necessary, and can be viewed from

all sides.

• The nameplate is clearly visible.
• It can be operated from a location with secure footing.

CAUTION!
The manufacturer is not liable for any damage resulting from improper use or use other than the
intended purpose. This applies in particular to hazards due to insufficient corrosion resistance
and suitability of the materials in contact with product.

AD_VA40_II2G_R02_en_4002262402_PRT.book Page 10 Wednesday, June 26, 2013 2:33 PM