3.1 Notes on installation

3.2 Mounting position and flange deviation

• Mount flowmeter either with converter aligned upwards or downwards.
• Install flowmeter in line with the pipe axis.
• Pipe flange faces must be parallel to each other.

Inspect the cartons carefully for damage or signs of rough handling. Report damage to the
carrier and to the local office of the manufacturer.

Check the packing list to check if you received completely all that you ordered.

Look at the device nameplate to ensure that the device is delivered according to your order.
Check for the correct supply voltage printed on the nameplate.

Figure 3-1: Mounting position and flange deviation

1 L

max

2 L

min

Max. permissible deviation of pipe flange faces: L

max

- L

min