Completed add-a-track system – Tennsco L&T User Manual
Page 2
1
3
2
4
2
2
5
6
7
8
8
STEP 1) Locate the Leveling Screws (#1) (a quantity of 8 will be required for the 36" units, and 10 for the 48").
Thread them into the Track Assembly (#2) through the weld nuts with the socket facing up. Adjust all screws into
their upper most position. Continue this procedure until each Track Assembly in the system is complete.
STEP 2) Locate the Floor Protecting Channels (#3) on the floor with the “U” facing up; two (2) will be needed for each
Track Assembly. Approximate the position for the Floor Protector Channels (#3) and lay them in place. Next lay the
Track Assemblies on top of the channels. The leveling screws should be directly on top of the channels.
STEP 3) Locate the Roll Pin (#4) and drive it into the hole drilled at the end of each track. This is designed to fit very
tightly and will require a ball peen hammer. The opening will only permit the Roll Pin to be driven in partially; the
remaining portion of the Roll Pin will fit into the opening in the next Track Assembly. Position the next Track Assem-
bly in place; make sure you have a tight fit to insure smooth operation.
STEP 4) Once you have joined the Track Assemblies together, locate the Track Splice Channel (#5). Install the
Track Splice Channel over the flange at the rear of the Track Assembly and secure using a 10 - 32 x 1
3
/
4
hex head
screw (#6), external tooth lock washer, and
1
/
4
x 20 hex nut (#7). Tighten firmly making sure that each track is
secure to the next.
STEP 5) Install the Rubber Bumpers (#8) at the end of each Track Assembly run, using two- (2)
1
/
4
x
1
/
2
self-tapping
screws. If these are not installed the carriage will roll off the end of the track.
Completed ADD-A-TRACK System
End View
3
1
2