beautypg.com

Installing cover and cover rails, Logo should be oriented as shown below. correct, Incorrect – ShelterLogic 62790 12 x 20 x 8 Garage-in-a-Box User Manual

Page 10

background image

05_62790_0C

Page 10

8. instAllinG coVer AnD coVer rAils

A. Lay the cover on the ground next to the frame with inside of the cover (the side with the pipe pockets) facing

down and the webbing on the front and rear of the corner of the building.
B. Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of over-

hang at all four corners.
C. Insert the “S”- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet

and pull tight. Wind the ratchet so that the webbing overlaps itself.
D. Disassemble cover rails and slide through fabric pockets at each leg and reattach with clamps to each leg.

Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts completely.
E. Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight.

NOTE: The ShelterLogic

®

logo should

be oriented as shown below.

CORRECT

Webbing and Ratchets Securing Cover

Front

reAr

INCORRECT

802695

COvER RAILS

10115

802695

13202

01011

01010

Corner

Leg

End Rib Cover Rail Clamps

10115

802695

802695

13201

Middle

Leg

01010

01011

Middle Rib Cover Rail Clamps