7. InStAllInG coVer AnD coVer rAIlS
CORRECT
10240
Webbing and Ratchets Securing Cover
Middle Rib Cross Rail Clamps
10115
802695
802695
13201
802693
01010
01011
End Rib Cross Rail Clamps
10115
802695
13202
802637
01011
01010
A. Lay the cover on the ground next to the frame with inside of the cover (the side with the pipe pockets) facing
down and the webbing on the front and rear of the corner of the building.
B. Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of over-
hang at all four corners.
C. Insert the “S”- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet
and pull tight. Wind the ratchet so that the webbing overlaps itself.
D. Disassemble cover rails and slide through fabric pockets at each leg and reattach with clamps to each leg.
Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts completely.
E. Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight.