beautypg.com

Installing cover and cover rails – ShelterLogic 70413 6 x 12 x 8 Shed-in-a-Box User Manual

Page 8

background image

05-70413-0C

Page 8

CORRECT

10110

COvER

RAILS

8. InStAllInG coVer AnD coVer rAIlS

A. Lay the cover on the ground next to the frame with inside of the cover (the side with the pipe pockets) facing

down and the webbing on the front and rear of the corner of the building.
B. Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of over-

hang at all four corners.
C. Insert the “S”- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet

and pull tight. Wind the ratchet so that the webbing overlaps itself.
D. Disassemble cover rails and slide through fabric pockets at each leg and reattach with clamps to each leg.

Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts completely.
E. Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight.

NOTE: The ShelterLogic

®

logo should

be oriented as shown below.

Webbing and Ratchets Securing Cover

Front

reAr

Middle Rib Cross Rail Clamps

10115

13201

802445

01011

End Rib Cross Rail Clamps

10115

13202

802427

01011