beautypg.com

ReadyLIFT Ford F350 Super Duty 4WD, 2011-2014 - 5 Lift Kit - Series 3" User Manual

Page 16

background image

www.ReadyLIFT.com - Phone: (800) 549-4620

Installation Instructions 49-2000, 49-2001, 49-2002

16

Revised Feb‐14 

Final Checks & Adjustments

Post Installation Warnings: Once the vehicle is lowered to the ground, check all

parts which have rubber or urethane components to insure proper torque. Torque
wheels to factory specs. Move vehicle backwards and forwards a short distance to al-

low suspension components to adjust. Turn the front wheels completely left then right
and verify adequate tire, wheel, brake line, and ABS wire clearance. Test and inspect

steering, brake and suspension components for tightness and proper operation. In-
spect brakes hoses and ABS lines for adequate slack at full extension. Failure to per-

form the post inspection checks may result in vehicle component damage and/or per-
sonal injury or death to driver and/or passengers. Test drive vehicle and re-check the

torque of all fasteners and re-torque wheels on vehicle. Re-adjust headlamps.

Vehicle Handling Warning: Vehicles with larger tires and wheels will handle differ-
ently than stock vehicles. Take time to familiarize yourself with the handling of your
vehicle.

Wheel Alignment/Headlamp Adjustment:

It is necessary to have a proper and professional wheel alignment performed

by a certified alignment technician. Align the vehicle to factory specifica-
tions. It is recommended that your vehicle alignment be checked after any

off-road driving. In addition to your vehicle alignment, for your safety and
others, it is necessary to check and adjust your vehicle headlamps for proper

aim and alignment

Vehicle Re-Torque and Safety Inspection:

Upon completion of all services and adjustments performed on your vehicle, and within
50 miles of driving, check to ensure all fasteners and hardware are properly torqued to

specification as noted in the vehicles factory service manual or the torque chart in-
cluded.