beautypg.com

English – Pfister 8T5-CS0C User Manual

Page 4

background image

4

Thank you for purchasing this Price Pfister product. All Price

Pfister products are carefully engineered, and factory tested

to provide long trouble-free use under normal conditions.

This product is easy to install using basic tools and our easy

to follow illustrated instructions. If you have any questions

regarding this product, see info on previous page.
1 BEFORE PROCEEDING

WARNING: Read all the instructions completely before

proceeding. Price Pfister recommends calling a professional

if you are uncertain about installing this product!
This product should be installed in accordance with all local

and state plumbing and building codes.
2 SHUT OFF WATER SUPPLY

Locate water supply inlets and shut off the water supply

valves. These are usually found under the sink or near the

water meter. If you are replacing an existing faucet, remove

the old faucet from the sink and clean the mounting surface

thoroughly.
3 ASSEMBLY INSTRUCTIONS

If operating pressures exceed 5 BAR (~75 PSI), the use

of a pressure reducer is recommended. Before proceeding

with the assembling, we advise to clean the hot and cold

water tubes, in order to avoid build-up of dirt that could

compromise the functioning of the valve.

Supply

Suggested

Maximum

Minimum

Hot Water

Temperature

65 Cº (150ºF)

80 Cº (175ºF)

15 Cº (60ºF)

Operating

Pressure

3 BAR (44PSI)

5 BAR (73PSI)

0.5 BAR (7PSI)

ENGLISH

1

2

8

6

9

3

4

7

5

B

1 1/4” DIA. Hole

1 1/4” DIA. Hole

1 7/16” Min - 1 31/32” Max

A

1

2

3

4 VALVE INSTALLATION (Fig.A)

For Center Hole (1) on plaster wall, use the edges from

Plaster Guard (2) to inscribe Cutting Edges (3). Cut Center

Hole (1) along inscribed lines, as shown. The Depth

is measured from center of Valve Body (2) to finished

wall surface (1) is 1 7/16" min. to 1 31/32" max. The

tub spout and shower outlet holes on the wall are to be

1 1/4" diameter.
5 VALVE INSTALLATION (Fig.B)

Place the Valve Body (1) into the wall, with the Shower

Outlet (2) facing the up. Remove plastic caps (3) with

the help of a flathead screwdriver. Body inlets (4&5) and

outlet (2) are designed to accommodate 1/2-14 NPT pipe.

Connect the Hot Water Supply (6) to the Left Inlet and the

Cold Water Supply (7) to the Right Inlet. Plug bottom Valve

Outlet (8) with Pipe Plug (9) as shown.
WARNING: When attaching threaded fittings, use thread

sealant or PTFE Plumber’s tape according to manufacturer’s

instructions.
CAUTION: When using iron pipes, it is not recommended

to reduce outlet pipe diameter.
CAUTION: For Copper Sweat joints, it is important

to remove Valve Cartridge and other Plastic Components

from the Valve Body before soldering. Use copper pipe

adapters (not furnished) in this type of installation.