beautypg.com

En g li sh – Pfister R89-8CBK User Manual

Page 4

background image

When the valve is turned on, water normaly flows through the Tub Spout (13A).

To activate the shower, turn valve on and pull the Knob (13B) up. Hold on until

water flows continiously from the shower arm.

14 FINAL FLUSHING

Thread Shower Head (15A) onto Shower Arm (15B).

Make sure Shower Head (15A) is securely tightened to Shower Arm (15B).

MAINTENANCE & CARE

.

CAUTION: Maintenance

DISASSEMBLY

1. Replacement parts may be available at the store where you purchased

your faucet.

2. When replacement parts are not available, please write or call Price

Pfister Consumer Service.

3. Always turn off water and relieve pressure before working on your

faucet.

NOTE: Trim Care

Cleaning Instructions:

For all Handles and decorative finishes, use only a soft damp

cloth to clean and shine. Use of polish, detergents, abrasive

cleaners, organic solvents or acid may cause damage.

Use of

other than a soft damp cloth will nullify our warranty!

Special Trim:

Trim products which contain Porcelain or other similar

substance are not acceptable for public areas or Commercial

use. Installation of Said Trim is at Users Risk!

By rotating the Lever Handle (12A) slightly counterclockwise, the valve will be

fully activated to the “COLD” position. The water temperature can be increased

by continuing to rotate the Lever Handle (12A) in a counterclockwise direction.

13 TUB SPOUT FUNCTION

For final flushing, turn valve on and allow water to run through the Tub Spout

(14A) for several minutes. Pull Spout Knob (14B) up to allow water to run through

Shower Arm (14C). Allow water to run for several minutes untill all foreign mater

clears the line.

15 SHOWER HEAD INSTALLATION

13

12

14

15

4

ENGLISH

EN

G

LI

SH

FULL HOT

FULL COLD

CLOSED

OPEN

UP

For

Shower

12A

13A

13B

15A

15B

14A

14B

14C