En g li sh – Pfister R89-8CBK User Manual
Page 4
When the valve is turned on, water normaly flows through the Tub Spout (13A).
To activate the shower, turn valve on and pull the Knob (13B) up. Hold on until
water flows continiously from the shower arm.
14 FINAL FLUSHING
Thread Shower Head (15A) onto Shower Arm (15B).
Make sure Shower Head (15A) is securely tightened to Shower Arm (15B).
MAINTENANCE & CARE
.
CAUTION: Maintenance
DISASSEMBLY
1. Replacement parts may be available at the store where you purchased
your faucet.
2. When replacement parts are not available, please write or call Price
Pfister Consumer Service.
3. Always turn off water and relieve pressure before working on your
faucet.
NOTE: Trim Care
Cleaning Instructions:
For all Handles and decorative finishes, use only a soft damp
cloth to clean and shine. Use of polish, detergents, abrasive
cleaners, organic solvents or acid may cause damage.
Use of
other than a soft damp cloth will nullify our warranty!
Special Trim:
Trim products which contain Porcelain or other similar
substance are not acceptable for public areas or Commercial
use. Installation of Said Trim is at Users Risk!
By rotating the Lever Handle (12A) slightly counterclockwise, the valve will be
fully activated to the “COLD” position. The water temperature can be increased
by continuing to rotate the Lever Handle (12A) in a counterclockwise direction.
13 TUB SPOUT FUNCTION
For final flushing, turn valve on and allow water to run through the Tub Spout
(14A) for several minutes. Pull Spout Knob (14B) up to allow water to run through
Shower Arm (14C). Allow water to run for several minutes untill all foreign mater
clears the line.
15 SHOWER HEAD INSTALLATION
13
12
14
15
4
ENGLISH
EN
G
LI
SH
FULL HOT
FULL COLD
CLOSED
OPEN
UP
For
Shower
12A
13A
13B
15A
15B
14A
14B
14C