beautypg.com

En g li sh – Pfister R89-8CBK User Manual

Page 3

background image

Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place

Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).

Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).

Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to finished wall

surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to

use the longer end.

8 HANDLE ATTACHMENT

Screw Stem Extender (8A) onto the Valve Stem (8B). Thread the Set Screw (8C)

into the Handle (8D) and thread it in only three to four turns. Place Handle (8D)

onto the Stem Extender (8A) and tighten the Set Screw (8C) by using the Hex

Wrench (8E) that is provided.

Make sure Set Screw (8C) is securely tightened to handle (8D).

9 SHOWER ARM INSTALLATION

Apply PTFE plumbers tape on both ends of Pipe Niple (10A) (not included).

Screw Pipe Niple (10A) into the elbow inside the wall and tighten with pipe

wrench. The Pipe Niple (10A) is to project 3

7

/

8

" to 4" from the finished wall.

Screw Tub Spout (10B) onto Pipe Niple (10A) and tighten until Spout is properly

positioned and flush to the finished wall.

11 UNIT START UP

Turn on hot and cold water supplies, and check all connections for leaks.

12 VALVE FUNCTION

Insert the end of Shower Arm (9A) through the Shower Flange (9B). Apply PTFE

plumber's tape to both ends of Shower Arm (9A) according to manufacturer's

instructions. Screw the end of Shower Arm (9A) into pipe elbow inside the wall.

Slide Shower Flange (9B) tight to the wall.

10 SPOUT INSTALLATION

7

8

11

9

10

3

ENGLISH

EN

G

LI

SH

7A

8A

9A

7B

7C

7C

7D

7E

7G

8B

8C

8D

8E

9B

10A

3

7

/8” to 4”

10B

10C