beautypg.com

English, Drain body installation – Pfister GT49-RP0K User Manual

Page 4

background image

ENGLISH

ENGLISH

12

DRAIN BODY INSTALLATION

13

11

12 WATER SUPPLY CONNECTIONS

First, thread Inlet Connectors (12A) into Water Supply Lines (12B). Then, insert Inlet
Connectors (12A) into Valve Bodies (12C).

Hot water supply lines go into left inlet.

Cold water supply lines go into right inlet. (Supply lines not included). Please follow
manufacturer’s instructions when installing supply lines. Next, insert Clips (12D) into
Valve Body Holes (12E), to secure unit.

WARNING: Do not twist Inlet Connectors (12A) once installed!

13 POP-UP INSTALLATION

Install and adjust Pop-Up (13A) using separate instructions supplied with the Pop-Up
assembly.

11 HOSE CONNECTION

From underneath sink, push Center Connector (11A) onto receiving Tube (11B), until
unable to push any further. Pull down on Center Connector (11A). If the housing and
the Inner Collet (11C) separate slightly but do not pull off receiving Tube (11B), the
connection is secure.
To remove, push up on Center Connector (11A) holding plastic Collet (11C) in place,
pull down on Center Connector (11A) until Tube (11B) is free.
Slide the End Connectors (11D) with arrow (11E) pointing up onto the Valve Bodies (11F).
Push the End Connectors (11D) all the way up until completely seated. Be careful not
to damage O-Rings (11G).

4

HOT

COLD

13A

12A

12D

12D

12E

12D

12A

12B

12B

12B

12C

12C

11B

11A

11D

11D

11E

11F

11F

11F

11G

11G

11E

11D

11A

11B

11A

11B

11C

11A

11C