English – Pfister GT49-RP0K User Manual
Page 3
ENGLISH
ENGLISH
7
8
9
10
7 HANDLE FLANGE ATTACHMENT
Place Plastic Ring (7A) and Flange (7B) over Valve Body (7C) covering the Valve Body
Washers (7D). Secure by threading Plastic Nut (7E) onto the Valve Body (7C).
9 SPOUT BODY ATTACHMENT
Insert Lift Rod (9A) into hole at the back of Spout Body (9B). Apply plumber’s putty
into putty groove in bottom of Seal Ring (9D). Place Washer (9C) and Seal Ring (9D)
against the bottom of Spout Base (9E). Place Spout Base (9E) against the bottom of
Spout Body (9B). With Spout Body (9B) facing forward, carefully install the Lift Rod
(9A) and Shank (9F) through the center hole of sink (9G).
10 SECURING SPOUT BODY
From underneath sink, secure Spout Body (10A) by placing Metal Washer (10B) and
threading Long Nut (
7
/
16
Hex.) (10C) onto Mounting Post (10D). Make sure that the
bumps on Metal Washer (10B) are facing up. Make sure Lift Rod (10E) moves freely.
Firmly hand tighten Long Nut (10C). Secure Long Nut (10C) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
8 HANDLE INSTALLATION
With valves in “CLOSE” position, place Handle Hub (8A) onto Valve Stem (8B), connect
Lever (8C) onto Handle Hub (8A).Attach and secure with Screw (8D). Attach Decorative
Button (8E).
3
7A
7D
7D
7B
7B
7E
7A
7E
8A
8D
8E
8C
8C
8D
8E
8A
8B
8B
7C
7C
10A
10B
10E
10C
10D
9A
9B
9C
9E
9G
9D
9F
9B