beautypg.com

Operational safety, Assembly instructions, Operation and safety – Qualcraft UltraPro Steel Outrigger System User Manual

Page 2: Read before beginning assembly

background image

2

All photos and drawings in this booklet are for reference purposes only. Refer to applicable OSHA codes and regulations for the proper use of this equipment.

operational safety

metal conducts electricity:
Do not use this equipment where contact may be made with power lines or other live electrical circuits.

failure to understand and folloW all safety rules and assembly instructions could result

in serious inJury or deatH.

read before beginning assembly.

operation and safety

Do not use this equipment if you are in poor health, taking medications, drugs, or have been consuming alcohol,

all of which may impair your ability to work safely on this product.

Always use this scaffold in conformity with local or national legislation which applies.
Never stack more than two units.
Always use outriggers and guardrails when stacking units.
Inspect before use. Do not use scaffold if damaged or parts are missing.
Examine thoroughly to make sure unit is properly set up.
Before scaffold units are to be stacked, a set of (4) Outriggers with casters shall be installed on the base section of

scaffolding. The casters must be the same size as the casters in the base scaffold.

Outrigger must be flush against scaffold leg and caster must be in contact with the surface.
Guardrails must be installed on all open sides of a work platform where a person could fall from a height

of 6 ft (1.8 m) or more.

Always fasten the guardrails system to the structure using locking pins or bolts.
Securely lock all braces and platform before each use.
There must be a minimum of two side braces installed on each scaffold level and evenly spaced throughout the scaffold.

Lack of adequate bracing could cause scaffold to collapse.

The casters must be the same size as the casters in the base scaffold.
Always use casters locked to the structure with the locking pins.
Do not climb unless all casters are in locked position.
Lock the casters on the outriggers each time you lock the casters on the base scaffold. This is to be done prior

to climbing the scaffolding.

Erect to be plumb on firm and level surface.
Must be used on a firm surface that is free of pits, debris, holes or obstructions.
Never place anything under or attach anything to a scaffold to increase height or to adjust to uneven surfaces.
Acids are corrosive and can seriously affect strength. Do not expose to corrosive substances.
Keep scaffold free of debris and unnecessary equipment.
Always keep body centered inside structure of scaffold.
Remove or fasten all tools, material or equipment before moving. Use extra caution when moving to avoid tipping.
Never try moving this scaffold while standing on it.
Never move a scaffold with a worker within.
Do not use powered devices to propel this scaffold. Use extra caution near operating machinery.
Do not use if the surface is not firm and level.
Do not use in inclement weather or high winds.
Maintain a firm grip while climbing.
Do not modify the scaffold or any of its components.
Do not use the scaffold as a footbridge.

1

Erect the scaffold (one or two frames high) by following the manufacturer instructions.

2

Install caster into outrigger and secure it with lock pin. Set caster brake. Repeat with the other casters.

3

Place outrigger to end scaffold frame at a 90° angle to the side brace.

4

Lock outrigger into place by using two locking pins. If you use scaffolding with casters, you must

first remove the locking pin of the caster to attach the outrigger and then replace the locking pin

to lock the caster and base of the outrigger.

5

Firmly tighten the tightening knob so that the scaffolding and the outrigger are perfectly

lined up and united.

box contents

QTY.

DescriPTion

4

Outriggers

4

Tightening knobs

4

Casters

8

Locking-pins

1

2

3

4

5

assembly instructions