LevelOne FGP-2472 User Manual
Page 165
159
3-24. Reboot
We offer you many ways to reboot the switch, including power up, hardware
reset and software reset. You can press the RESET button in the front panel to
reset the switch. After upgrading software, changing IP configuration or changing
VLAN mode configuration, then you must reboot to have the new configuration
taken effect. Here we are discussing is software reset for the “reboot” in the main
menu.
Function name:
Reboot
Function description:
Reboot the switch. Reboot takes the same effect as the RESET button on the
front panel of the switch. It will take around thirty (30) seconds to complete the
system boot.
Fig. 3-79
Parameter description:
Save and Reboot:
Save the current settings as start configuration before rebooting the
switch.
Reboot:
Reboot the system directly.
- WBR-6005 (124 pages)
- N_Max WBR-6001 (3 pages)
- WBR-6003 (80 pages)
- WBR-6012 (79 pages)
- WBR-6022 (99 pages)
- WBR-6022 (89 pages)
- WBR-6022 (87 pages)
- WBR-6801 (53 pages)
- WBR-6802 (35 pages)
- WBR-6803 (66 pages)
- WBR-6804 (70 pages)
- WBR-6805 (49 pages)
- WGR-6012 (83 pages)
- WGR-6013 (93 pages)
- FBR-1461 (106 pages)
- WBR-3470 (114 pages)
- WBR-6603 (76 pages)
- PLI-2040 (8 pages)
- PLI-2040 (5 pages)
- PLI-3021 (28 pages)
- PLI-3110 (10 pages)
- PLI-3410 (69 pages)
- PLI-4051 (28 pages)
- PLI-4510 (29 pages)
- FEP-0800 (3 pages)
- FEP-1600 (3 pages)
- FEP-1601 (4 pages)
- FGL-2870 (800 pages)
- FGP-1000 (3 pages)
- FSW-0503 (2 pages)
- FSW-0511 (6 pages)
- FSW-0513 (5 pages)
- FSW-1671 (46 pages)
- GEP-0950 (86 pages)
- GES-0852 (29 pages)
- GES-1650 (94 pages)
- GES-1651 (128 pages)
- GES-1652 (94 pages)
- GES-2450 (94 pages)
- GES-2451 (128 pages)
- GES-2452 (94 pages)
- GSW-2457 (12 pages)
- GSW-2457 (11 pages)
- GSW-4876 (314 pages)