LA STEELCRAFT FLP-20 User Manual
Steelcraft products, Surface mounted, In-ground installation instructions
20'-0"
4'-0"
8'-0"
FOUL POLE
DATE: 6/23/09
DRAWN BY: AFS
DO NOT SCALE DRAWING
STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91103
PHN 626-798-7401 FAX 626-798-1482
MODEL
FLP-20
SHEET
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
SURFACE MOUNTED
USING THE CLIPS (4) AND BOLTS (3) .
5. TIGHTEN ALL BOLTS AND SET SCREWS.
IN-GROUND INSTALLATION INSTRUCTIONS:
1. DIG FOOTING AT PROPER LOCATION
30" DIA. X 60" DEEP
2. PLACE POST (1) INTO FOOTING AND SUPPORT
IN A PLUMB CONDITION WITH THE OUTSIDE
EDGE OF PIPE TANGENT TO THE OUTSIDE OF
THE FOUL LINE AND CLIPS TOWARDS THE
PLAYING FIELD. TOP OF POST TO BE 20'-0"
ABOVE FINISHED GRADE.
3. POUR CONCRETE AND WAIT 37 HOURS.
4. INSTALL THE PANELS TO THE TOP POST (1)
AVAILABLE
1 OF 1
(SUPPLIED BY OTHERS)
CONC. FOOTING
1
2
4
FINISHED GRADE
30"DIA. X 60" DEEP
ANTI-ROTATIONAL
PLATES
STEEL PLATE
FLP-20SM
SURFACE MOUNT DETAIL
16" X 16" X 1"
1" DIA. HOLES
ITEM QTY. PART
NO
DESCRIPTION
1
1
F04FP04B
4-1/2" OD Sch 40 POST @ 24'
2
2
F02FP000
SCREEN
3
8
P01FP000
BOLT/WASH/NUT (3/8" X 2-1/4")
4
1
F02FP001
CLIPS w / BOLTS (3/8" X 1-3/4")