J. diagram for vertical venting – HTP EFT-399 User Manual
Page 45
45
LP-387 REV. 6.10.14
J. DIAGRAM FOR VERTICAL VENTING
Figure 23
– LP-293-F
NOTE:
Vent piping should be 12” over anticipated maximum snow level.
NOTE: Drawing is meant to demonstrate system venting ONLY.
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.