Care of the battery pack – SKC Limited Pocket Pump MTX User Manual
Page 29

www.skcltd.com
210-PMTXM Issue F
Page 27
Care of the Battery Pack
Battery Testing
1. Connect SKC approved charger to battery pack. If charger indicator LED illuminates, battery pack charger
input is ok. If charger LED does not illuminate, battery pack input fuse is blown - Replace battery pack.
2. Leave battery pack connected to charger to fully charge.
3. If pump does not function at all after full charge of battery pack, battery pack output fuse has blown, or
battery cells have failed or are at end of life - Replace battery pack.
4. If pump functions after full charge of battery pack but gives significantly reduced run times before low
battery shutdown, battery cells are failing or are at end of life - Replace battery pack.
Battery Replacement
Refer to the pump component diagram on page 28. To remove the battery pack slide down and remove the
slide cover. Unfasten the two screws revealed beneath the slide cover. Unfasten the screw that secures the belt
clip and remove the belt clip and rear case, to reveal the battery pack. Carefully pull the battery pack upwards
out of the pump case.
Fit the replacement battery pack, taking care to ensure that the battery connector engages with the pins of the
connector on the pump PCB. Re-assemble the pump case in the reverse of the above procedure. Charge the
new battery pack fully before use.
Battery Disposal
• The EC Battery Directive and equivalent legislation in other countries requires that all batteries and battery
packs are disposed of correctly at the end of their working life. This means that they must be collected and
treated separately from other waste.
• Please ensure that any end-of-life SKC battery packs are collected and recycled or disposed of correctly.