beautypg.com

Fairbanks Toledo DigiTol - RC/Intalogix Conversion User Manual

Page 3

background image

3. Complete all mechanical removal and replacement, then locate

and mount the boxes (SSCs or Junction Boxes) to the box-

mounting-bars.

4. Re-connect or make new ground straps that are needed for a

proper installation.

5. Ensure all load cells are plumb and properly 'loaded', then

loosen and set the checking to proper gap, 1/32" - 1/16".

6. Leave a 'drip-loop' in the cable at the cell and at the box entry.

8/04

3

50651 Issue # 2

Cup Anti-Rotation Pin

Load Cell
Anti-rotation Pins