Installation – Poweramp CENTRAPOWER User Manual
Page 13

11
4111-0030 — Nov.2009
INSTALLATION
Centra Power main control panel should be located
near the Central Power pump station.
The pump control panel has 2 lights located on the
door. There is 3 position switch mounted in side
the door. The switch on the system controls one or
both motors when a leveler has been activated. The
lights on the control indicate if one or both motor
starters have tripped.
If only one pump is being used, rotate motors every
6 months. This will make sure both motors are fresh
and working.